The old Rauner primary school, a sprawling conglomerate from the 1960s, was partially demolished. In its place, a compact, three-storey building is now available for the approximately 850 pupils. For the shell and the exposed concrete surfaces, 6,000 m³  recycling concrete was used, 30% of which consists of recycled building rubble - 1,800 m³ of recycled material replaced chippings and gravel.

 

 

Finalisation

2020

GFA
Owner

City of Kirchheim unter Teck

Specialist planning

Project management: Ernst2 Architekten; statics, fire protection, building physics; CSZ Ingenieurconsult; electrician: Elektro Hofecker; installation building services: Speidel

Manufacturer recycling concrete
Manufacturer recycling aggregate
Construction company
@rehbogen
@rehbogen

The old Rauner primary school from the 1960s, a sprawling conglomerate of pitched-roof buildings and corridors, was partially demolished. In its place, a compact new building was constructed, which opened in 2018 with learning centre 1 for the Rauner comprehensive school. This was followed in 2021 by Lernhaus 2 for the Teck secondary school, while the remaining existing buildings in the south of the campus were renovated.
The rooms are not designed for frontal teaching, but encourage a variety of learning methods. Three to four large learning and course rooms each form a cluster, supplemented by smaller, shared differentiation rooms with individual workstations and group tables for four to eight pupils. A spacious corridor connects the learning rooms and can be used as a multifunctional learning zone. It also offers views of the green atrium or the northern schoolyard.
The concrete surfaces of the new buildings look like conventional exposed concrete surfaces, but 6,000 m³ of recycled concrete, 30% of which was recycled construction waste, was used here. The use of recycled concrete has been mandatory for public construction projects in Kirchheim since 2014. To ensure that the surfaces remain uniform, the grain size of the recycled material must not be larger than 16 mm. Both the material and the concrete come from regional companies. Since 2023, the Baden-Württemberg Ministry of the Environment has been supporting the use of recycled concrete with a funding programme.