Coca-Cola plant
Through environmentally friendly manual dismantling and the optimal synergy of re-use and recycling, €100,000 in sales were generated during the dismantling of the Coca-Cola plant on behalf of the building consortium of eight property developers (including ÖSW, ARWAG, Wiener Heim, GESIBA). For example, 5,000 roof panels from the Coca-Cola plant were made available for reuse on site as thermal insulation in the new building in the Biotope City Quarter. 3,000 m2 of extensive green roofs, i.e. the top soil substrate layer including the plant cover, have also been secured and are ready for use.
Completion of dismantling
2017
Building owner
Building consortium of 8 property developers (including ÖSW, ARWAG, Wiener Heim, GESIBA)
Specialist planning
Project participants
Effect achieved
- 4200 hours of employment / 15 people employed
- 450 tons for re-use
BauKarussell
Other interesting projects from the category Circular economy
Floriette residential complex
The historic north façade of this old building was extensively renovated in 2022/23 and became the face of the new “Floriette” building.
21 residentia...
HORNIG AREAL
On behalf of the Austrian Housing Association, BauKarussell planned the dismantling of the former J. Hornig coffee roastery in Graz in 2023 with a cle...
EDGE Südkreuz Berlin
EDGE Südkreuz Berlin is an innovative seven-story office complex constructed using a modular timber-hybrid design. It consists of two standalone build...
Hensel barracks Villach
The Austrian federal army commissioned BauKarussell with the use-orientated demolition of the Hensel barracks in Villach. Together with Schindel &...
Alpenos Headquarter
The new headquarters of Alpenos, located in the Non Valley, is a perfect example of innovative design and sustainability. The project, developed by th...
Richardstraße primary school
Richardstraße primary school in Hamburg responded to growing pupil numbers with a three-storey extension. The new building, which cost 5.7 million eur...
MA 48 Crew building
The MA 48 team building in Vienna-Simmering is the first building to use recycled concrete. The recycled content in the concrete is around 15 - 20 per...
Fire station building of the Holcim cement plant
The new fire station at the Mannersdorf cement plant was built as an operational facility for the plant fire brigade. The compact building volume is f...
Adnet elementary school
A new elementary school is being built in Adnet over a planned construction period of two years. The current school will be renovated and extended usi...
Wohnbau Leyserstrasse
The ‘Rosalie’ residential building in Penzing is part of a neighbourhood development at the Theodor Körner barracks. The barracks park was made access...