Logistics hall
The building is heated and cooled with a thermally active floor slab. For this purpose there is a reversible heat pump.
Building owner
Apparatebau Kirchheim-Teck GmbH
Finalization
2019
Heating demand
41,9 kWh/m²a
Architecture
Special planning

c
The building is heated and cooled with a thermally active floor slab. For this purpose there is a reversible heat pump which gets the heat and cold from 11 geothermal probes with 150 m depth. A photovoltaic system is installed on the greened flat roof for the company's own electricity needs.

Ingenieurplanung Söllner

Ingenieurplanung Söllner
Other interesting projects from the category Thermal Activated Building
com22PLUS
On the northern outskirts of Vienna - in the area of Berresgasse / Hausfeldstraße, 1220 Vienna - a new urban district is being created. On 19 hectares...
Office building COPA-DATA
Encased in a homogeneous, satin-matt metal façade, the exterior of the compact new office building of software developer COPA-DATA conveys the objecti...
Single family house Wimmer
This house has a modern design, yet integrates into the Bavarian landscape and is equipped with advanced technology....
Simulation room Bauakademie
In order to test the efficiency of thermal building component activation with concrete in practice, the consortium "Nachhaltige BAUTEILAktivierung" in...
ZSW Baden-Württemberg
The Center for Solar Energy and Hydrogen Research Baden-Württemberg, ZSW, moved into its new institute building at the Stuttgart site last year. The s...
Primary school Wals-Siezenheim
The new building for the primary school, after-school care and other communal functions forms an anchor point for the entire town in the no-man's land...
Energon
The office building with up to 420 workplaces is the head of a row of buildings along the Berliner Ring in the "Science Park II" in Ulm. The symmetric...
Primary school Hallwang
The compact structure is designed to clearly organize functions and spatial relationships. Due to the urban setting, the open areas of the kindergarte...
Parish Seetal
The construction emphasizes constructive wood protection. The heating works fully solar by means of concrete core activation. The building was designe...
LivingImFranks
At the beginning of 2022, a residential complex with a total of 83 attractive residential units and 3 commercial premises was completed on the propert...