Logistics hall
The building is heated and cooled with a thermally active floor slab. For this purpose there is a reversible heat pump.
Building owner
Apparatebau Kirchheim-Teck GmbH
Finalization
2019
Heating demand
41,9 kWh/m²a
Architecture
Special planning
c
The building is heated and cooled with a thermally active floor slab. For this purpose there is a reversible heat pump which gets the heat and cold from 11 geothermal probes with 150 m depth. A photovoltaic system is installed on the greened flat roof for the company's own electricity needs.

Ingenieurplanung Söllner

Ingenieurplanung Söllner
Other interesting projects from the category Thermal Activated Building
ILV - TZ Klagenfurt
In 2008, the 6-story Institute for Food Safety and Veterinary Affairs was built for all laboratory units of the Carinthian provincial government with ...
Residential building Deck Zahn
Deck Zehn marks the beginning of the Neues Landgut urban quarter, a new district taking shape near Vienna’s main railway station, where around 1,500 a...
Building services Steiner
As a "SALZBURG 2050 partner company", Steiner building services has decided to act in a particularly climate- and energy-conscious manner. In 2017, a ...
Student residence District Living / DC Tower 3
The District Living student dormitory makes use of a small gusset site in the middle of Donau City between business buildings, the subway line and the...
Office building Zapf-Daigfuss
A successful combination of old and new: In Behringersdorf, a district of Schwaig, a new office building was constructed for the KS*, the sand-lime br...
model house Bonum
The show house of the company Bonum in Altdorf is a semi-detached house in typical Franconian architecture. The steep gable roof even allows the expan...
Green Eastside – Leben am langen Felde
In the new urban development area “Leben am langen Felde,” an ecological showcase residential building has been created, offering the highest level of...
Das Koloman
87 unique apartments with a high feel-good factor are being built in the heart of the Weinviertel's largest town.
The excellent infrastructure of Stoc...
House with a pond
With the completion of the "House with a pond", the model construction project "Living + Working in Rosenheim" in November 1999, a fascinating idea ha...
Residential and commercial building (passive house) in Julbach
Certified passive house - heated & cooled by air-conditioned ceiling in combination with air-to-water heat pump, approx. 24kWp PV system with 10kW...