Logistics hall
The building is heated and cooled with a thermally active floor slab. For this purpose there is a reversible heat pump.
Building owner
Apparatebau Kirchheim-Teck GmbH
Finalization
2019
Heating demand
41,9 kWh/m²a
Architecture
Special planning
c
The building is heated and cooled with a thermally active floor slab. For this purpose there is a reversible heat pump which gets the heat and cold from 11 geothermal probes with 150 m depth. A photovoltaic system is installed on the greened flat roof for the company's own electricity needs.
Ingenieurplanung Söllner
Ingenieurplanung Söllner
Other interesting projects from the category Thermal Activated Building
John Cranko school
The famous John Cranko Ballet School in Stuttgart has been given a new "cross over" building. The three main functional areas, consisting of housing (...
Bundesschule Aspern
The architects have implemented a new type of spatial and functional program, whitch was desired by the Ministry of Education and the BIG, in a way th...
The Circle, Zürich airport
In close proximity to the terminals of Zurich Airport, a new urban district has been created in the form of the Circle. A floor area of 37,000 m2 was ...
Addition winery Reeh
Halbritter Architects used concrete to exploit all the refinements of the building material for the extension to the Reeh winery. Concrete was produce...
Das Deutschlandhaus
The Deutschlandhaus in Berlin has found a new tenant since last year in the form of the Foundation Flight, Expulsion, Reconciliation. Marte.Marte Arch...
Apartment buildings Mailergasse
The climate-active-certified and EU taxonomy-compliant residential project with a total of 155 rental apartments is characterized by a CO₂-optimized e...
Hohe Warte
On the former presidential grounds near the meteorological station on Hohe Warte, five residential buildings have been created that seem to have settl...
CO-livingSeeparq
Live, work, share: SEEPARQ combines everything under one roof. 55 freely financed condominiums with large balconies, freely designable apartment sizes...
LivingImFranks
At the beginning of 2022, a residential complex with a total of 83 attractive residential units and 3 commercial premises was completed on the propert...
Passive house
Passive house in solid construction with concrete core activation and firewood stove: The heat supply is completely with renewable energy....