Kulturkraftwerk oh456
The plus-energy office building oh456 with attached small hydropower plant serves as a prototype for testing innovative technologies. The building will be made accessible to a wider public as a venue for a wide range of events, as a demonstration and lecture object on the subject of climate relief, and as a joint advertising platform for sustainable construction.
Finalization
2014
Floor space
1.569 m²
Structural engineering
Reibenwein-Forsthuber, Kurz Pock
Planning
Walter Luttenberger
The Kulturkraftwerk is a hybrid building made of unreinforced stamped concrete walls and cross-laminated timber panels. On three levels the building offers space for several individual offices, on the first floor is situated a library, bread and games and an event room.

Walter Luttenberger

Walter Luttenberger

Walter Luttenberger
Other interesting projects from the category Thermal Activated Building & Ecology & Sustainability
Klimahaus
The Klimahaus sits like a ship in the new Havenwelten tourist area. It actually consists of two separate reinforced concrete structures with a glass f...
ÖKK-Headquarter
The architecture of the new ÖKK headquarters points to its public significance as part of the new urban fabric of Landquart. It thus follows the urban...
Primary school Wals-Siezenheim
The new building for the primary school, after-school care and other communal functions forms an anchor point for the entire town in the no-man's land...
Germany's first residential building from the 3D printer
Germany's first residential building to be produced using a 3D printer was to be supplemented with innovative building technology in the area of heati...
SST Solar
The new building with a total usable area of 1,500 m² was erected in steel and reinforced concrete construction with industrially prefabricated buildi...
Business Building Zuber Beton GmbH
For its new office building, Zuber Beton GmbH was looking for a reliable heating and cooling system that could be installed quickly and easily in ther...
Semi-detached house Allersberg
In the case of the 2-family house in Allersberg, the installation of the KS-QUADRO THERM system provides for wall tempering as well as wall cooling in...
Villa K
An art collector wished for a villa. Architect Peter Todorov was allowed to fulfill his wish. The result is impressive and convinces with its spatial ...
Office building EIGNER
At the beginning of 2020, the Nördlingen-based company EIGNER Bauunternehmung GmbH moved into its new office building in the direct vicinity of the bu...
Alnatura Campus
For the 55,000 square metre Alnatura Campus, the former barracks site in the southwest of Darmstadt was extensively renaturalised. Sealed areas were b...