Kulturkraftwerk oh456
The plus-energy office building oh456 with attached small hydropower plant serves as a prototype for testing innovative technologies. The building will be made accessible to a wider public as a venue for a wide range of events, as a demonstration and lecture object on the subject of climate relief, and as a joint advertising platform for sustainable construction.
Finalization
2014
Floor space
1.569 m²
Structural engineering
Reibenwein-Forsthuber, Kurz Pock
Planning
Walter Luttenberger
The Kulturkraftwerk is a hybrid building made of unreinforced stamped concrete walls and cross-laminated timber panels. On three levels the building offers space for several individual offices, on the first floor is situated a library, bread and games and an event room.
Walter Luttenberger
Walter Luttenberger
Walter Luttenberger
Other interesting projects from the category Thermal Activated Building, Ecology & Sustainability & Low Tech
BORG Oberndorf
A spacious school courtyard, which continues into the inner courtyard of the school, creates a striking and clear access situation to the school build...
Das Haus der sozialen Sicherheit
After a two-year renovation phase, the approximately 350 employees of the Main Association of Social Insurance Institutions were able to move back int...
Bavarian State Parliament - North Building
With the completion of the extension in the north courtyard in May 2012, a new building was added to the ensemble of the Maximilianeum in Munich. This...
2226 residential
The building in Dornbirn shows a premiere: For the first time, a residential building was constructed according to the principles of the Energy Concep...
Extension Art House Zürich
The extension of the Art House Zürich is consistently well thought through. Architecturally a milestone - sustainable, above all because of concrete a...
model house Bonum
The show house of the company Bonum in Altdorf is a semi-detached house in typical Franconian architecture. The steep gable roof even allows the expan...
Smarthouse
For the new administration building of all Hochtief branches in the Munich area, a ceiling construction with component activation was designed for ene...
Wientalterrassen
With the Wientalterrassen project, the non-profit developer WBV-GPA is building a sustainable showcase project in which a large number of innovations ...
ZSW Baden-Württemberg
The Center for Solar Energy and Hydrogen Research Baden-Württemberg, ZSW, moved into its new institute building at the Stuttgart site last year. The s...
Schilder Systems
The company building of Schilder Systeme was implemented as a hybrid building with reinforced concrete skeleton and prefabricated timber frame wall el...