technical facilities, technical installations

TGA is the abbreviation for technical building services (technical building equipment). The term refers to all technical equipment installed in the building or permanently connected to it, as well as technical equipment in outdoor facilities that serve the functional use of buildings.

The challenges and changes brought about by climate change and digitalization are also significant in the field of technical building equipment - but so are the opportunities.

Read more


Technical building equipment (TBE) includes all systems used to supply buildings:

In addition to heating, ventilation and sanitary systems, MEP also includes areas such as cooling, air conditioning, water and wastewater, building automation and acoustics.

Filter posts
Hide filters
Categories
Apply filter and show results

Alnatura Campus

For the 55,000 square metre Alnatura Campus, the former barracks site in the southwest of Darmstadt was extensively renaturalised. Sealed areas were b...

Kliniken Südostbayern, Neubau BT 15

Due to the developments in recent years with shortening of patient stays, increasing cross-professional cooperation, expansion of possibilities in dia...

office building 2226

The goals: The Crinolbau, in need of renovation, was to make way for a contemporary and economical replacement building that respects its historical s...

Storchennest

The house in Kuchl consists of an insulated lightweight floor slab, the exterior timber frame walls, the room-dividing CLT structures and the prefabri...

Redevelopment Hallein

The gentle low-tech revitalization transformed the inhospitable old building into comfortable, contemporary living space in the middle of Hallein's hi...

House Dornbirn

Plastered 50 bricks, oak, concrete, little steel, glass - high-quality materials and simple construction make the monolithic single-family house robus...

Agricultural college Bruck

For the specialized training 'wood processing', the province of Salzburg needed a model workshop, which should be possible at each of the four agricul...

Building services Steiner

As a "SALZBURG 2050 partner company", Steiner building services has decided to act in a particularly climate- and energy-conscious manner. In 2017, a ...

ILV - TZ Klagenfurt

In 2008, the 6-story Institute for Food Safety and Veterinary Affairs was built for all laboratory units of the Carinthian provincial government with ...

Salewa

The building complex, which resembles the mountain massif of the Dolomites, is composed of a conglomerate of cuboids and polygonal structures that hou...

2226 residential

The building in Dornbirn shows a premiere: For the first time, a residential building was constructed according to the principles of the Energy Concep...

Klimahaus

The Klimahaus sits like a ship in the new Havenwelten tourist area. It actually consists of two separate reinforced concrete structures with a glass f...

Südweststrom

On the site of the Tübingen public utility company in the south of the university town, Steimle Architekten realized a new administration building for...

Administration in Beilngries

A new administration building for approx. 150 employees was to be constructed for Schmidt-Seeger GmbH with its Beilngries site. The building is divide...

Fiscal office Aachen

The tax office center on Krefelder Straße in Aachen houses a total of five offices. In its internal structure, the 71 x 118 m building is divided into...

Passive house

Passive house in solid construction with concrete core activation and firewood stove: The heat supply is completely with renewable energy....

CO-livingSeeparq

Live, work, share: SEEPARQ combines everything under one roof. 55 freely financed condominiums with large balconies, freely designable apartment sizes...