Südpack
After a construction period of only two years and with a total investment of 40 million euros, a two-story production and storage hall, a four-story office and social building, and a 27-meter-high high-bay warehouse have now been built on an area of around 10 hectares.
Building owner
Südpack Verpackungen GmbH & Co. KG
Finalization
2020
Architecture
Redle Architects
Specialist planning

Redle Architekten, Südpack Verpackungen GmbH & Co. KG
After a construction period of only two years and with a total investment of 40 million euros, a two-story production and storage hall, a four-story office and social building, and a 27-meter-high high-bay warehouse have now been built on an area of around 10 hectares. With the help of thermal concrete core activation, the temperature of the building is controlled in heating and cooling mode.

Redle Architekten
Other interesting projects from the category Thermal Activated Building
Sonnenhaus office building
The building complex has a residential / usable area of approx. 600 m², of which 420 m² are office / 180 m² residential....
Schilder Systems
The company building of Schilder Systeme was implemented as a hybrid building with reinforced concrete skeleton and prefabricated timber frame wall el...
Apartment building Egnach
In Egnach, energy-saving heating and cooling is being used in an innovative way in a new apartment building. The use of a modern heat pump solution ba...
Single family house Wimmer
This house has a modern design, yet integrates into the Bavarian landscape and is equipped with advanced technology....
Haus Adeline Favre
The Katharina Sulzer Square was the center of the foundries. It is characterized by the industrial character of the factory buildings made of yellow-b...
Klimahaus
The Klimahaus sits like a ship in the new Havenwelten tourist area. It actually consists of two separate reinforced concrete structures with a glass f...
Seniors residence Beeskow
In Beeskow, a senior citizens' residence and three urban villas have been built to provide a new home for up to 200 residents since 2021. The large-sc...
Germany's first residential building from the 3D printer
Germany's first residential building to be produced using a 3D printer was to be supplemented with innovative building technology in the area of heati...
Parish Seetal
The construction emphasizes constructive wood protection. The heating works fully solar by means of concrete core activation. The building was designe...
ETA Factory
The ETA factory of TU Darmstadt is located in the Lichtwiese campus and was completed in March 2016. Since then, the model factory has been used in pa...