Südpack
After a construction period of only two years and with a total investment of 40 million euros, a two-story production and storage hall, a four-story office and social building, and a 27-meter-high high-bay warehouse have now been built on an area of around 10 hectares.
Building owner
Südpack Verpackungen GmbH & Co. KG
Finalization
2020
Architecture
Redle Architects
Specialist planning

Redle Architekten, Südpack Verpackungen GmbH & Co. KG
After a construction period of only two years and with a total investment of 40 million euros, a two-story production and storage hall, a four-story office and social building, and a 27-meter-high high-bay warehouse have now been built on an area of around 10 hectares. With the help of thermal concrete core activation, the temperature of the building is controlled in heating and cooling mode.

Redle Architekten
Other interesting projects from the category Thermal Activated Building
ZSW Baden-Württemberg
The Center for Solar Energy and Hydrogen Research Baden-Württemberg, ZSW, moved into its new institute building at the Stuttgart site last year. The s...
Alpacem Headquarters
With the new Alpacem headquarters, a prime example of the decarbonization of construction was achieved - with CO2-optimized concretes and component ac...
University College of Teacher Education Tyrol
The renovation and expansion of the Tyrol University of Education demonstrated how building renovation can be carried out in a resource-efficient, tec...
office building Maschinenring
For the state headquarters of the machinery ring, the client wanted a constructive solid wood building of high energy efficiency with concrete core ac...
Sports hall Liefering
With the triple sports hall in Liefering, the city of Salzburg has a pilot project regarding Smart City Standard. As a plus-energy building, it was aw...
Parish Seetal
The construction emphasizes constructive wood protection. The heating works fully solar by means of concrete core activation. The building was designe...
Villa K
An art collector wished for a villa. Architect Peter Todorov was allowed to fulfill his wish. The result is impressive and convinces with its spatial ...
Smarthouse
For the new administration building of all Hochtief branches in the Munich area, a ceiling construction with component activation was designed for ene...
Türkenwirt building BOKU
The new building responds to its surroundings in terms of scale. In terms of building law, the above-ground structure (54 % BRI) is not utilized to th...
Bundesschule Aspern
The architects have implemented a new type of spatial and functional program, whitch was desired by the Ministry of Education and the BIG, in a way th...