Bus depot
The goal of Jäger KG was to unite all services under one roof with the new construction of the bus depot, administration, workshop, tire storage with attached bus washing facility, as well as a carport.

Ingenieurplanung Söllner
The goal of Jäger KG was to unite all services under one roof with the new construction of the bus depot, administration, workshop, tire storage with attached bus washing facility, as well as a carport. On the neighboring property there is a bus port in steel construction with arched roof structure. A heat pump uses the ground as an energy source via 118 activated bored piles. The installed concrete core activation is used to heat and cool the building.

Ingenieurplanung Söllner

Ingenieurplanung Söllner
Other interesting projects from the category Thermal Activated Building
Baumeisterhaus
The "Landesinnung Bau", as the building owner, has constructed a model project in Graz: 22 residential units with a size of 35 to 60 square meters off...
Sports hall Liefering
With the triple sports hall in Liefering, the city of Salzburg has a pilot project regarding Smart City Standard. As a plus-energy building, it was aw...
Viertel Hoch Zwei
Gewog Arthur Krupp worked intensively on a completely new concept for social housing, which is considered a showcase project in terms of energy techno...
Apartment building Egnach
In Egnach, energy-saving heating and cooling is being used in an innovative way in a new apartment building. The use of a modern heat pump solution ba...
Türkenwirt building BOKU
The new building responds to its surroundings in terms of scale. In terms of building law, the above-ground structure (54 % BRI) is not utilized to th...
Student residence District Living / DC Tower 3
The District Living student dormitory makes use of a small gusset site in the middle of Donau City between business buildings, the subway line and the...
Business Building Zuber Beton GmbH
For its new office building, Zuber Beton GmbH was looking for a reliable heating and cooling system that could be installed quickly and easily in ther...
Q 11 Simmering
The new-build urban quarter, Quartier 11, constructed in 2018, is designed as a load-bearing steel structure with solid reinforced concrete floors. Th...
Climatic room
As part of the Copernicus research project "Synergie", a climate room was completed in 2019 in the hall area of the ETA factory (TU Darmstadt), which ...
Primary school Hallwang
The compact structure is designed to clearly organize functions and spatial relationships. Due to the urban setting, the open areas of the kindergarte...